Design and implement a preheating and centrifugation station to determine the degree of settling of sediments and water (BS&W) of oil

Main Article Content

Manuel Jaramillo

Abstract

This document describes the design and implementation of a station for automating the process of measuring the degree of settling of sediments and water (BS&W) in oil. For this purpose, a cylindrical-type robotic manipulator has been included in the process, which will carry out the tasks of taking and positioning objects in the station, thus providing precision and accuracy to the aforementioned process.

Downloads

Download data is not yet available.

Article Details

How to Cite
Design and implement a preheating and centrifugation station to determine the degree of settling of sediments and water (BS&W) of oil. (2015). MASKAY, 5(1), 23-28. https://doi.org/10.24133/maskay.v5i1.122
Section
TECHNICAL PAPERS

How to Cite

Design and implement a preheating and centrifugation station to determine the degree of settling of sediments and water (BS&W) of oil. (2015). MASKAY, 5(1), 23-28. https://doi.org/10.24133/maskay.v5i1.122

References

[1] A.S.O.T materials, Prueba ASTM D4007 2014, en linea, disponible en http://www.astm.org.

[2] ARDUINO, Arduino CC 2013, en linea, disponible en http://arduino.cc.

[3] I. T. I. CALDAS, Automatización y robótica educativa 2004, en línea, disponible en http://automatica.mx.

[4] I. t. s. Calkini, Instituto tecnológico superior de Calkini 2009, en linea, disponible en http://itescam.edu.mx.

[5] CHINT, CHINT componentes eléctricos 2013, en linea, disponible en http://chint.net.

[6] B. electronics, Bourns electrónicos 2014, en linea, disponible en http://alliedelec.com.

Similar Articles

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

<< < 4 5 6 7 8 9 10 11 > >>